Delaware County (OH) Board of Commissioners · 2026-05-13

Transcript

Delaware County TID Meeting- May 13, 2026

1127 segments

the May 13th Delaware County

Transportation Improvement District

meeting. If we could all please rise if

you're able for the Pledge of

Allegiance.

>> I pledge allegiance to the flag of the

United States of America,

and to the republic for which it stands,

one nation under God, indivisible, with

liberty and justice for all.

>> Well, good morning, everybody. I'm Tracy

Davies, the vice chair. Next to me I

have Saki who's the secretary and

treasurer, and then we have the public

members of our board, Pat Blaney and Tom

Price.

Uh our chairperson, Chris Bowser man, is

unable to be here today. And also for

our board members, just uh staffing

change, Brandy Wilson with the

commissioner's office, she left to move

to Florida, and so you all remember Ali

Glusich, she's back in helping us out

with the TID.

All right, first on the agenda we have

the election of officers for the term of

May 13th to

2026 to May 12th, 2027.

Um

I'll leave it up to the group if we want

to do a slate of nominations or we

>> make a motion to appoint the current

officers to another term

on this board.

>> Okay, we have a motion.

Is there a second?

>> Second.

>> Any discussion? That would be continuing

to have Chris Bowser man as chairperson,

myself, Tracy Davies, as vice

chairperson, and uh Saki as the

secretary treasurer.

Any further discussion?

All in favor?

>> I.

>> I.

>> Motion carries. Great.

Do we have anyone from the public who

would like to comment today.

No?

Okay.

Next, we have approval of minutes from

the March 11th, 2026 meeting. I don't

know if you've had an opportunity to

review those minutes, but uh

if there aren't any changes or

corrections, I'll take a motion to

approve the minutes.

>> Move to accept the minutes.

>> Second.

>> We have a motion and a second. Any

further discussion?

All in favor?

>> Aye.

>> Aye.

>> Any opposed? Okay, motion carries.

Do we have any reports from our board

members

today?

No?

Nothing at this time? Okay.

Secretary-Treasurer's report.

>> The current cash balance is

$5,833,834.44.

And we're

our auditors are currently auditing us

and wrapping up. So, hopefully at the

next board meeting, I'll be able to

report on that.

>> Any questions?

>> Move to accept the Secretary-Treasurer's

report.

>> Second.

>> Any discussion?

All in favor?

>> Aye.

>> Aye.

>> Motion carries. Thank you.

Moving on to staff report and maybe some

introductions, Rob Riley.

>> All right. Well, uh good morning. Thank

you, Madam Chair. Uh the uh it is my

pleasure to recognize some of our

uh summer interns. Uh I'll ask them to

stand up and uh I'm going to pick on

them a little bit and

ask them to uh

tell us their name and uh where they're

from, where they're going to school, and

anything else uh you want to share with

us. So, start with the guy on the end.

He's one of our

>> If you could come to the podium so cuz

we are

we

>> for our massive viewing audience, we

want to make sure that they can hear

you.

>> I'll face this way.

>> Yes.

>> Okay.

Uh my name is Will Music.

Um I live in Ostrander, so just west of

Delaware.

Um

This is my second summer with the

county. It's been a great experience and

I am studying civil engineering at Ohio

University. I'll be a junior next year.

>> Well, welcome. Good to see you. Thank

you.

>> Good morning. Uh my name is Nate

Hickman. I'm from Cardington, Ohio, so

just north of Delaware.

Um this is my second summer interning

here and uh

I go to Ohio University where I'm

studying environmental science and I'm

heading into my senior year.

>> Great.

>> Thank you.

>> Well, welcome back. Thank you.

>> Hello. Hi, I'm Cadence Ford. I live in

Delaware City. I This is also my second

year interning with the county and I go

to the University of Pittsburgh for

chemical engineering and I will be a

junior next year.

>> Great. Well, welcome back.

>> Thank you.

>> It's nice to see three people back. We

must not have scared them away, so good

job, engineer's office.

>> Yeah, we're very glad to have uh our our

young folks back and

it's uh

Chris and I remark from time to time

it's kind of nice to get some young

blood in the office and

uh

feel the energy, I guess, of youthful

exuberance, I guess, so

but uh it's been fun. We have a lot of

uh projects lined up for our interns

this summer and uh it'll be fun, so

um

So, I will take uh

a few moments just to run through the

staff report uh

since the last meeting.

Um

So, uh as you know, we have a number of

active projects.

Just run through these quickly. I know

you're all aware of these current

projects. Silken Heartland regional

projects. These are the two roundabouts

on County Line Road, Delaware Licking.

Those are currently under construction.

We are working

currently at Center Village Road.

That should be

hopefully done and wrapped up by

July of this year. The crews will then

move on to the Fantazier Road

intersection and have that done

hopefully in September.

I-71 36-37 interchange. If you've driven

past, you know there's a lot of

activity, a lot of progress has been

made especially in the last month or so.

All of the new bridge beams were set

over about the last month for the new

overpass.

And so that's moving along very well.

Still on schedule for completion third

quarter of 2027.

Phase B and C.

Phase B is the next segment to the west

that will run west to 3B and K.

ODOT is currently working on

right-of-way acquisition for that phase.

And we do expect that will be ready to

go to construction in 2027. So more to

come on that. Currently working through

the the property purchase

and some utility relocation later this

year.

And then last but not least phase C,

which is the final segment to the west.

Plans are currently in design.

We will be

probably moving into right-of-way

acquisition about a year from now, a

year and a half from now on that phase

and tentatively starting construction in

2029.

So

if there's any questions on that, that's

kind of a snapshot of where we're at.

>> Rob, any updates on funding for phase B?

>> Not yet. You'll note note in the report

that ODOT did apply for

what the Federal Highway Administration

calls their build program. These are

grants that are

allocated directly by the USDOT to

states and local agencies. ODOT

submitted for that program, have not yet

heard back on on the success of that

application, but we'll keep our fingers

crossed on that.

>> Any questions?

Continue on, please.

>> Moving on, Orange Road Railroad grade

separation. We continue to make progress

on that project, no significant updates.

We are

will be going into

acquisition of right-of-way for the

remaining properties that are needed

probably later this year

with construction starting 2028.

And then finally, Stockwell Road

improvements. We do have resolution for

your consideration today, which would

authorize the county engineer to go out

to bid,

but the plans been completed, the

right-of-way has been acquired, and we

are

at this time really just awaiting the

OPWC

grant agreement award, which typically

comes out around the 1st of July. That

would go to Trenton Township. Trenton

was the applicant for that

in cooperation with the other three

townships, but pending

we would like to go to bid on that, get

the bids advertised and opened prior to

that time, so

at our July meeting, we would hope to

have a contract ready to award at that

time.

Moving on to potential future projects,

and I say potential because these are

not yet

not yet solidified, but

I've spoken to you about two of these

three. Bunny Station Road again.

This is involving the

uh, fifth Olentangy Local School

District High School.

Uh,

the work would involve widening Buddy

Station Road for

turn lanes in into the school.

Uh, because of where their entrances

sit, uh, we've had some discussions with

the school district. We've had

discussion with Liberty Township and um,

City of Delaware

about

uh, trying to make that section of road

a three-lane section with a continuous

center turn lane.

Uh, basically starting at the Seldom

Seen Parkway roundabout going west, uh,

not quite a half a mile, roughly half a

mile.

Um, which would uh, address what we know

is the case is high schools generally a

lot of traffic. There's a lot of cars

coming in and out throughout the day.

And so having that uh, turn lane would

make that really a better uh, situation

for really everyone.

So,

uh, I

believe we talked uh, in brief at the

last meeting about the idea of the TID

uh, assisting uh, Olentangy schools and

the townships with acquisition of

right-of-way.

And um,

I had a recent meeting with uh,

Olentangy Local Schools as well as

Liberty Township. I think there's

uh,

concurrence and and I think the time uh,

is quickly approaching where we will as

board need to make a decision on whether

we want to do that. And I would

uh, say this, you know, uh,

we we make every effort uh, when we

uh, try to purchase right-of-way to make

a fair offer, uh, negotiate a fair

settlement. Uh, sometimes that happens.

I would say the majority majority of

time that does happen. We're able to

reach agreement.

Uh, sometimes it does not. Sometimes the

the offer and

the owner's expectation of compensation

are two different, and so that um

sometimes results in us having to move

forward with the project,

um filing what uh you you may know is

called appropriation,

and then moving ahead with the project

while we continue to try to negotiate a

settlement. So,

um I bring that up because that would be

if if the board does wish to proceed uh

in this manner, that would be something

this board would need to consider

um if there is uh any appropriation

action, I believe

uh we will work with prosecutor's office

to either

uh

get representation directly uh from the

prosecutor's office or potentially hire

independent counsel if if needed. Uh I

have not gotten that far yet, but I did

want to make you aware of that

possibility. So,

uh really this is still in the

discussion phase. Um not recommending

any action today, but I have outlined in

the report

sort of the framework of a potential

agreement, uh and I'm I'm interested in

hearing your your feedback on that.

>> Question. In the report, it says

Olentangy would acquire the necessary

right-of-way. So, that's not the case?

>> If it does say that, I that is an error.

Uh

>> to obtain

and pay for plans, surveys, legal

descriptions, etc. to acquire necessary

right-of-way.

>> They would yes, they would uh Olentangy

Local Schools is is paying for the

design and the actual

plans and right-of-way plans and as well

as the legal descriptions, all the

paperwork that would be needed to

acquire the right-of-way. They would not

actually be doing the right-of-way

acquisition per se. That that would be

something that

we would be doing under this proposal.

I'm I'm sorry for that for the confusion

there.

But the uh school district would be

reimbursing the TID. I want to make sure

that's clear. Uh the arrangement we've

discussed to date has been that

Olentangy would reimburse uh the TID.

Olentangy uh they

Obviously they're in the business of

educating kids. They're not necessarily

in the business of following all the

statutory procedures that go with

acquiring purchasing road right-of-way

and so that's really the the source of

this discussion.

>> If the TID were were not to do it, who

would be the entity that would do it?

The Township?

>> I think that would be the next option

would be for the two Townships because

there's two Townships involved Delaware

Township and Liberty.

That would be sort of the next option.

>> In that case they're still relying on

the County Engineers offices

as

your their engineering.

>> Correct.

>> Chairman.

>> Yes.

>> The other

what five

schools that we built for

it was built for Olentangy there was no

need for us to be step in on those was

there?

>> There was not.

I would call this somewhat of a unique

circumstance because it's on a Township

line road partially within the city.

More jurisdictions on this than is

typical. You'll recall all of the

project we did on Bean Oller a couple of

years ago.

That was a case where there was really

only believe there were two two parcels

involved. The county did at that time

step in the Engineers office handled the

acquisition of right-of-way

on that and then you recall the TID

we handled the construction contract

were reimbursed by the

by the school district as well as

Townships and the OPWC grant. So,

um you're you're right, Tom. This is

This is something different, for sure.

>> Does the property just in front of the

school in the picture here then doesn't

extend

onto Sawmill where the three-lane

or the third lane will be

planned for?

>> So, if you look at the graphic,

uh

where it says entrance two, uh from that

portion going east towards the

roundabout, that's currently two lanes.

Uh it starts to widen out once you get

to

you can kind of see where it hits the

the field uh just to the north and west

of the roundabout. Uh that's where it

goes to what what I what I call a full

two-lane section.

The plan would be to kind of blend into

that.

Uh

you know, stop the three-lane section

where it it starts you hit the the

median or the splitter island. It would

go back to two-lane section.

Uh but there would be under the proposed

uh improvement a continuous three-lane

section essentially from that the west

end of that splitter island all the way

west across the school frontage.

>> So, there'd be right-of-way acquisition

there, too?

>> Yes.

>> I understand the need for someone to

step up to the plate.

Not that I couldn't get there. I'm a

little hesitant for the TID board to be

taking property if it gets to that

situation.

Um

but

I think it maybe if we had more details

and any kind of inclination if neighbors

are supportive, not supportive, it would

might be helpful.

>> And that's fine, Madam Chair. I I

certainly not looking for a decision

today. This this feedback is very

helpful. I I completely understand the

concern. This is not something that TID

has really done to date, acquire

property.

And uh

if you're going to do it, you have to be

committed to do it cuz it doesn't help

to get part way through it and realize I

have one or two folks that I just can't

get agree agreement with and so the

project can't move ahead. So

Um what I can tell you is the district

and their engineer are working on the

plans. They will have probably more

details as we're moving ahead in the

next 2 months. I can certainly report

back to you with maybe some more detail.

>> Do you know if they've had conversations

with any of the adjacent neighbors yet?

>> Uh I don't. I don't know that.

>> They might be very well supportive. I

don't know. I would hope cuz

you know, something to alleviate the

traffic in front of their homes.

Questions? Comments?

>> good.

>> Okay.

Well, uh

>> Does that give you enough feedback?

>> It it does. I appreciate that. Um again,

I'll I'll

I do expect over the next couple of

months we'll have some more details with

respect to the the the extent of any

right of way acquisition as the engineer

moves through the design and I can

certainly report back to you at the July

meeting with

what I know at that time.

Uh

not certainly not a decision we may need

to make uh in the next 2 months. I don't

want this to be a come to a point where

it's a

uh do or die situation. I I don't think

any of us want that.

>> Yeah. No. Appreciate the early heads-up.

>> Yeah, I got one other thought.

Uh

so the road the road upgrade you're

talking about, the three-lane section as

well as all the improvements in front of

the school.

Is is is the school's intention to to

pay for all that?

>> So, the the

tentative plan we've discussed, at least

in concept, would be that one of the

townships and I

the last discussion with Liberty

Township, they expressed some

willingness to be the applicant. Similar

arrangement to what was done on

Stockwell, what was also done on Bean

Dollar, where a township steps forward,

makes an application to OPWC,

and then as you may know, the county

offer a grant

assistance basically to match the local

shares from each local agency.

Uh that can add up to a pretty big

amount once you start

getting multiple agencies putting in

money, the county's matching share plus

the OPWC funds. And this would be, I

think, a pretty competitive project

because it's the traffic volumes, the

the scope of the work is intended for

safety and

and traffic mitigation. So, I think this

would

fare pretty well in the application

process. So,

but yet in concept, the school district

will basically make up any remaining

share of the project cost.

Yeah.

>> Thank you.

>> Great.

>> So, with that, I'll I'll move on to the

next project. No significant Plum Road,

so you're aware if if you've been past

that area recently, there is one housing

development that is under construction.

There are at least one There's at least

one other

I'd say medium-sized development that is

planned and will start within the next

year or so. They're currently running

sanitary sewer for that.

So, we're we're

we will be seeing some traffic increases

on Plum Road. This is another case where

it's a split jurisdiction. The township

line falls on the center of the road,

and so you actually have four townships

involved, much like Stockwell.

Uh so, I think the TID is in a very good

position to assist when it comes to

maybe when it comes to construction,

maybe not for right away acquisition. We

can We're not there yet, I guess is what

I'm saying, but I did want to get out

ahead of this, make sure you're aware

some of these discussions are happening

and and if you do have feedback or

thoughts, I'm certainly open to that.

>> So, you intend to upgrade all the way

from Africa Road to State Route 3?

>> Uh more than likely in phases, Pat. I

think the the first phase would likely

include the intersection at 3 B's and K

and Plumb Road. That's probably the most

uh urgent need of improvement. It's a

It's a

three-legged intersection with stop

control.

Um radio the turning radii are bad. Uh

you've got a lot of school bus traffic

going through there. It's a narrow

section of road. It's more than likely

but the first section would go from

Africa Road to

what we think would be potentially a

roundabout at that intersection.

And then potentially future phases onto

the east from that point.

>> Okay.

Thanks.

>> So, again, I'll keep you up to date as

we have more discussions on that.

Um and then the third project I wanted

to at least present again again, this is

a introduction, no decisions and and

frankly, not much planning has happened

to date, but I do anticipate working

ahead.

Uh we've had some discussions with uh

Village of Galena regarding Vance Valley

Road.

Uh

you may be aware that the Miller Farms

development uh which is kind of right at

the corner of Sunbury Road and Vance

Valley includes about 385 homes being

developed by MI Homes.

Uh

a of a lot of traffic coming out of that

area.

Uh there's already traffic on Vance

Valley Road. This will certainly add to

that. So,

um and we're in some early discussions

with the village about uh potentially

upgrading that section of road. Uh

there's a couple of uh

there's one very sharp curve right at

Joe Walker Road, and then there's

another that's uh less than desirable as

you get it toward Sunbury Road. So,

um again, this is more of a kind of

heads-up uh that we're having these

discussions. I do think um

the TID's ability to

potentially finance upfront costs um

with reimbursement from multiple sources

uh puts us in a unique, helpful

position.

Um

>> Question on that. Um

I assume M/I submitted a traffic impact

study. Do you know what uh the village

was requiring of the developer?

>> Yes, the uh

so, the development does include two

accesses. One uh road goes out Sunbury

Road. That required and has already uh

the turn lane for that entrance has

already been installed or constructed.

The second entrance is off of Vance

Valley Road, goes to the north uh from

the development.

Uh rather than having M/I Homes

construct just a a turn lane for that

particular entrance, uh we agreed to

accept a contribution in lieu of

building that turn lane, which could

both be rolled into either uh this

project or some other project that

benefits that development.

Uh M/I Homes was amenable to that. We

felt it was the the best scenario

because we knew that at some point Vance

Valley would have to be upgraded. They

have also dedicated the right-of-way

that would be needed for

uh this improvement. So, that that's one

other benefit is that's taken care of.

>> And then that intersection of Joe Walker

and Vance Valley,

whose jurisdiction is that? Is it a

mixed one or is it Galena's?

>> The intersection itself is actually

entirely within the village limits, but

you don't have to go very far east or

west before it it comes back to being a

county road in this case. So, the

county, you know, we have a vested

interest in seeing this project advance

from a county highway standpoint, but

I think this body

has the possibility of being very

helpful to help accumulate some of those

funding sources and advance something.

>> There's already a lot of traffic in that

area.

>> Yes.

So, again, nothing today. Wanted to keep

you uh

>> I think Tom had a question.

>> Yes, sorry, Tom.

>> Uh what was the process on Staunton Road

when we opened or we took that curve

out?

>> So, Staunton Road was entirely county

funded. Uh there was a developer

contribution from

Liberty Grand. They have

a They built a new intersection right at

the S curve.

Uh rather than the developer

trying to

shoehorn a turn lane in, which they

really couldn't because the the

right-of-way limitations and the

geometry that it would have been a much

larger improvement.

Uh

the county accepted a contribution in

lieu of building that turn lane, rolled

that into the project uh that that we

completed recently.

>> So,

so similar.

>> Similar.

>> Thank you.

>> Okay.

>> So, with that, that is a that is what I

know about our current projects.

Um

Moving on to next items, we already took

care of our election of officers,

and

I don't believe there's anything else I

had to share with you. Oh, um

I did you recall that the

we submitted a an application for the

ODOT TID grant program back in March. I

did run into Eddie King. Eddie is the

ODOT Jobs and Commerce representative

for Central Ohio. He did share that

the state is still reviewing those

applications and and hopes to make an

announcement sometime soon. So, no no

word yet, but we'll keep our fingers

crossed. I think that was

I'm biased, but I think that was pretty

competitive application given what's

happening in the area and the magnitude

of the project and the relatively small

ask in terms of the total project cost.

So, I'll share anything I hear

on that.

>> Great.

>> With that, that concludes my report.

Thank you.

>> All right, any other questions for Ron?

I also before we go on to our next item

wanted to acknowledge that Commissioner

Benton is here today. So, thank you for

joining us.

And next on our agenda, we have

discussion of the cybersecurity policy

requirements and we have Chris Betts

from Prosecutor's Office.

>> Good morning, board members.

>> Good morning.

>> Christopher Betts with the

Prosecutor's Office on behalf of Melissa

Schiffel, Delaware County Prosecutor. I

appreciate you having me here this

morning. I can't believe we're talking

about summer interns already. I mean,

I'm glad it's summer, but

this year's flown by so far.

>> It has.

>> Um in any event,

um

the legislature enacted

under House Bill 96 back in the last

half of last year um

Revised Code 9.64,

which requires all political

subdivisions to have a cybersecurity

policy.

Um it's kind of strange that we're

talking about this with this board

because this board doesn't own or

maintain, to my knowledge, at least in

discussions with Rob,

um, any computer networks,

um, computers, etc. Um, probably some

data, uh, that that's maintained as far

as this board is concerned, but

everything else is is sort of maintained

under the umbrella of the county,

um, through the engineer's office or

other offices. So, it's kind of

interesting that we're talking about

this, but this still applies to the TID

in the sense that the TID is a political

subdivision,

um, at least as that's defined under the

statute. It's a body corporate and

politic that's smaller than the state,

and all of those are required to have

cybersecurity policies under the new

statute.

So, um, I just started discussing this

with Rob yesterday as to to where we go

with this.

Uh, the requirements were, um,

the statute became effective on

September 30th of last year,

um, and we need to have it talks in

terms of a uh, a cybersecurity program,

which really equates to a policy. Um,

what I have understood is that the

auditor is going to start looking for

this, at least as far as the counties

were concerned and the cities were

concerned, at the beginning of 2026.

Um, the other political subdivisions,

which would include this board, um,

they're going to start looking for that,

uh, starting July 1st of 2026. So, it's

something we need to kind of hop on and

get done.

Um, certainly don't want to create

anything that's cumbersome or burdensome

to this board, uh, but also want to

comply with the statute. So, one of the

things that that Rob and I had talked

about and are potentially looking into

and we'll discuss more, uh, before the

July meeting, uh, is whether we can go

ahead and and adopt, uh, or this board

can adopt what the county has adopted.

Um, my understanding is that Steve

Lewis, who is in charge of, um, IT for

the county has created uh,

a policy for this

and that's something that we could look

at potentially going ahead and adopting

rather than reinventing the wheel

and something that if the board at some

point does own its own computers,

computer infrastructure, etc.

That that can be implemented and used.

But we'll need to see what's in there. I

know one of the things that Rob was

concerned about was uh, you know, making

sure that any vendors or contractors

that the board would contract with have

sufficient

policies or programs in place for

cybersecurity.

I'm not sure exactly. I have not seen

specifically what's in um,

Steve Lewis's policy, the the one that

he drafted for the county, but we could

take a look at that and see if that is

covered in there as well.

It's not something that is specifically

as far as vendors and contractors is

um, addressed in the statute expressly.

There are about six items in there that

are in the statute that need to be in or

should be in your cybersecurity policy.

Um, those include, you know, identifying

this, you know, various threats and how

you're going to respond and

there's a training component in there as

well that applies to any employees. My

understanding is this board doesn't have

really have any employees so just board

members so we'll have to look at that as

well.

But in any event, hopefully most of

those things are addressed in in what

Steve has

already created so that we don't have to

reinvent that wheel.

If there's things that we need to add to

it, certainly we can that are specific

to this board, we can certainly look at

those and and go ahead and

you know, do any sort of amendment or

addition that we need to do

to to bring that policy

as being functional for the board. But

it's certainly something that that as

audits go forward in the future Um, we

want to make sure that we have. I don't

think that there's going to be, or at

least my understanding is that there's

not going to be cybersecurity policy

police out there checking to make sure

if you have a policy come July 1st, but

we want to be as close as we possibly

can uh, you know, to that date.

Um, I think it's going to be a lot like

public records policies where the

auditors, you know, ask to see it. Okay,

check mark star, you've got one kind of

a thing. Frankly, they're kind of

numbers people, so I don't know that

they're going to look into the technical

part of it, but we want to make sure

that technical part is is good to go,

and I, you know, I think Steve's been

with the county for a long time, so I

think he's probably drafted something

that that

um, is a good workable policy that we

can just sort of build on and and, you

know, covers those bases as a matter of

of protection and good public policy.

So, I'm happy to answer any questions.

Again, it was something that that Rob

and I just started discussing yesterday,

um, and we'll pull Steve's policy and

see what it says. We'll be back with the

board in July, um, and see where we go

from there in terms of of adopting

something.

>> All right, Chris. Yeah, three of us on

this board are already on another board

where that's being discussed.

>> Mhm.

>> And,

you know,

the way the way I look at it is that

it's a risk management transfer.

All right. So,

I I I'd like to have you, if you could,

give us a copies of Steve Lewis's policy

in advance,

>> Certainly.

>> so we can all look at it. But, my whole

point is, since we we don't have any IT

infrastructure, and don't plan to,

then then the idea of all this is to be

sure the risk is properly transferred to

the proper entity,

make the entity responsible for

complying with the code, and assuring us

annually that we are that they are

complying with the code, which to me

meets our obligation under the statute.

>> Mhm.

>> So, that's really what I'm looking at

here is total risk transfer away from

the board.

So,

I'd be interested to see what Steve has

on that.

>> Yeah, no, I totally understand where

you're coming from and and frankly,

um part of my discussion with Rob

yesterday was that, you know, the county

has to have this in the first place and

we certainly don't want to create

something duplicate to what the county

is doing, but the county should be

complying with all of those things in

the first place and I understand the

board wanting some assurance that you

know, that the offices that are that are

involved with this board, such as the

engineers office, you know, are in

compliance and can give some sort of an

assurance on an annual basis. So, I I

understand where you're coming from with

it.

>> Well, here's another question then.

All the counties in NCAs,

it appears, at least the one that we're

on,

is creating its own policy.

>> Mhm.

>> Is this proper going forward or should

all the NCAs be under the same policy

the county has?

>> I can't answer that.

>> Yeah, I'm not I'm not exactly sure um as

far as the NCAs are concerned and and

you know, I'm not the legal advisor to

the NCAs, so.

>> That's That's what I don't understand is

uh

they they're pretty much separate

entities from the from the county

offices, is that it? So, they can create

their own policies?

>> If you qualify as a political

subdivision under the statute, which

means that you're a body corporate and

politic that's smaller than the state,

you have to have one. What that looks

like

um could be different for different

entities. Again, there's six different

things that are in the statute that

are supposed to be in your be in your

policy or covered by your policy

um and you know, there there would be

different ways to

to write that, draft that or incorporate

it that would be specific to those

entities.

Um and you know, certainly we want to

look at whatever, you know, Steve's put

together and and see if it's something

that's workable for

um

this board. I presume that it probably

is.

Um but we'll take a look at that and

I'll certainly forward um

I can forward it to Rob. Rob can you

forward it on to the board members?

To have a copy in advance then?

>> Okay, thank you, Chris.

>> Sure, absolutely.

>> Thank you. Do we need to pass it before

July 1st? Should we be having a meeting

in June?

>> I think

you're supposed to have it by July 1st.

Again, I don't think that there's going

to be cybersecurity police that are out

there on July 1st that are looking to

make sure that you have the policy. I

think they're going to check it as a

part of your next audit to make sure

that you have it in place.

Um so, I think having it in place

um as soon as possible

either before or shortly after July 1st

>> Okay.

>> uh will um satisfy the auditors.

Um so, I think um I'm not sure when the

July meeting is scheduled. Um I'm

assuming it's probably the first half of

July.

>> Yes, July 8th is sufficient.

>> Yes.

>> July 8th. So, I think that's probably

sufficient for making sure that we have

something in place as soon as possible

or as close to that date as possible.

>> Thank you very much.

>> Sure. Any other questions?

>> Thanks for the explanation.

>> No problem. Thanks for having me.

>> Thank you, Chris.

>> Okay, down to resolution

2026-03

approving plans, specifications, and

estimates for improvements to Stockwell

Road and authorizing the county engineer

to advertise for bids. Rob.

>> Uh yes, thank you. Uh as I sort of teed

up in my report, uh we have completed

the plans and specs for this project.

Uh our schedule would be to

uh for bids uh within about the next

week

and then uh receive bids in June and

have a contract uh ready for you at the

July 8th meeting.

Uh current estimate for the project is

about $950,000

uh which is within the the budget we had

uh identified up front in the project

agreement. And so this project would act

and look very much like the uh Bynum

project that we undertook uh

a while ago.

Uh the county engineer would essentially

handle all the

management, construction engineering, uh

um

basically the the TID board would be

paying the invoices or SI would be

paying the invoices, I'd just say, and

then issue um

reimbursement invoices at the completion

of the job. So, um

glad to answer any questions.

>> Any questions?

>> No, no questions. I'm going to make a

motion we

approve this resolution.

>> Second.

>> Any further discussion?

If not, all in favor?

>> Aye.

>> Aye.

>> Aye.

>> Motion carries.

Good to see the project moving forward.

Thanks, Rob, for everybody's efforts on

that.

Any other business?

All right. I know we just talked about

it, but it looks like the next meeting

and so it sounds like we won't need

June.

>> Um

the only thing that we would have would

be the discussion of a cybersecurity

policy and and Chris uh Betts and I have

some work to do on that, so I I'm just

not sure that that warrants a a June

meeting at this time. Um so I

I've been planning uh that we would not

have a June meeting until July. I think

works for our purposes, my purposes at

least.

>> July 8th.

>> I don't like

Hopefully that works for everyone. I

likely won't be here, but I don't need

to be here, So.

As long as we have a quorum.

All right, if there's nothing else